Contact Us

Got Questions? We're Here to Help! Contact Us.


California
United States

+1 (510) 899-1340

Welcome to Service AI, your trusted source for accessories, spare parts, and certified pre-owned laboratory instrumentation tailored for scientists and startups. We provide reliable, current equipment at competitive prices, along with essential support for instruments no longer made or backed by their original manufacturers.

Our expertise spans leading brands like Beckman Coulter and Agilent, and we are committed to high-quality standards through certified maintenance, repair, and professional installation services. We believe our installation services provide the confidence and assurance you need when purchasing instrumentation from a reliable and trustworthy source.

At Service AI, we don't conduct the science—we empower scientists with reliable laboratory instrumentation and spare parts that are guaranteed to perform. We trust in scientists' expertise to determine the instrumentation they need to advance their research.

With more than 25 years of experience, our dedicated team prides itself on delivering only the highest quality products. Every instrument we offer has been thoroughly tested and certified by manufacturer-trained engineers. We ensure the functionality of our products with a Full Performance Guarantee and provide proof of performance documentation when applicable.

At Service AI, we also recognize the importance of meticulous shipping and safe delivery. Our products are handled with the utmost care to ensure they arrive in perfect condition. For those who require it, we offer professional installation services to help integrate our equipment seamlessly into your operations.

Purchase our reliable scientific laboratory equipment, and we’ll provide seamless installation service worldwide for your startup or research needs.

Advance your scientific endeavors with confidence: rely on us for recertified, trustworthy instruments at reasonable prices. It’s a smart choice made simple!

IMG_3502.JPEG

Guide to Centrifuge Questions

Service AI support guide for centrifuge questions. Please feel free to email us at support@serviceai.us

Filtering by Tag: Installation Procedure

How to Install a Beckman Coulter Optima Ultracentrifuge

Service AI

Important Note: To ensure proper electrical installation and checkup as outlined below, it is imperative to engage a certified electrician for power requirements. Furthermore, we highly recommend that a qualified engineer handles the installation and thorough inspection of your Beckman Coulter Optima L ultracentrifuge, while also providing training to your staff on its correct usage and handling of the ultracentrifuge and rotors before operation.

Power:

a. Check for correct wall receptacle and voltage at the outlet. Power required is 180 to 264 Volts AC measured as shown. It is advisable to test the line voltage at the plug while the instrument is accelerating and cooling; therefore, we would strictly recommend that the ultracentrifuge always be installed by a Beckman trained engineer. Service AI has Beckman Coulter trained service experts. You can email us at support@serviceai.us, or call us at our technical support line at +1-510-899-1340 for more information.

b. Remove console cover, front panel and top cover.

c. Make sure jumper connector on the power supply boards plugged into the correct voltage range socket J52 A, B, or C. (Select the jumper for the lowest voltage reading during maximum power consumption.)

J52 VOLTAGE RANGE

A 180 - 206

B 207 - 233

C 234- 264


Physical installation procedure:

a. Position ultracentrifuge in desired location. Maintain 6" minimum clearance at rear and 3" minimum clearance at each side.

b. Position the four pads provided under the leveling legs. Mark the position of each pad on the floor.

c. Roll out instrument away from pads.

d. Glue (epoxy) pads to floor.

e. Roll instrument back into position and screw the four leveling legs down into the pads until they have bottomed out.

f. Now screw each leveling leg down five additional turns. Make sure all four casters are off the floor.

NOTE: A solenoid inter-lock prevents the chamber door from being opened during operation and/or with the power off. The chamber door can be opened with the door handle only when the power to the ultracentrifuge is on and the vacuum is off.

g. Open the chamber door (see note above). Level the ultracentrifuge as if it had only three legs. Adjust level by placing the spirit level on the drive shaft (crown) and adjust the leveling legs so the air bubble is centered. First level it front- to- rear by adjusting the left front and left rear legs. Then level it left to right by adjusting the right front leg only. (Make sure you do not tilt the instrument). Screw in the right rear leg until it just touches the pad. Now screw it down 1/4 turn more. This does not affect the level of the instrument.

spirit level.jpg


h. After instrument is leveled, make sure all four casters are off the floor and all four leveling legs are still bottomed out.


website: www.serviceai.us; email: support@serviceai.us; technical support: +1-510-899-1340

Official   PayPal Seal